Foreigners' Comprehensive Services Hotline: 400-8678-110
Wenzhou Rail Transit Line S1 resumes operation in partial section from today
Source: | Author:pmtf105f8 | Publish time:2020-03-04 | 1710 Views: | Share:
Due to the need for epidemic prevention and control, if any inconvenience is caused to your travel, please understand and support this decision!
Wenzhou Rail Transit Line S1 resumes operation in partial section from Mar 4. After the operation resumes, there are adjustments on the S1 line, which are specified as follows:

1. The resumed operation section is from Tongling Station to Airport Station. And the Airport Station to Minjiangkou Station is connected by free bus.

2. The departure time of first and last train is adjusted in the resumed operation section. The first train from Tongling Station to the Airport Station departs at 6:30 and the last train departs at 21:10. The first train from Airport Station to Tongling Station departs at 6:19 and the last train departs at 21:39. The departure time of the first and last train in other stations is adjusted simultaneously. The running interval across the line is adjusted to 20 minutes.

3. The stations in the resumed operation section only open part of the entrances.


Passengers must comply with the following requirements when entering the station:

1. During the period of epidemic prevention and control, passengers taking Wenzhou Rail Transit Line S1 must wear masks all the time throughout the entire journey. Those who do not wear masks as required will be prohibited from entering the station.

2. Passengers must cooperate with the staff to take their body temperatures before entering the station, and present the "Wenzhou Health Code". If there is no health code, ID card + community permit (or work unit certificate) is required. Passengers whose health code is red or whose body temperature exceeds 37.3 ℃ should cooperate with the staff to the temporary quarantine point. Passengers whose health code is yellow are not allowed to enter the station.

3. During the period of epidemic prevention and control, Real-Name Management is implemented on Wenzhou Rail Transit S1 line. Before passengers enter the station, please use the Alipay APP to scan the "Information Registration QR code" at the entry and exit of the station for information registration. After completing the registration, passengers can enter the station. Those who cannot register with real name in Alipay should cooperate with the station staff to register offline.